California State University Long Beach (CSULB)
While employed with P2S, Inc.
Design planning and construction manager on various projects ranging from $500k-$2M; worked with campus architect to manage design consultants to extend bike path on campus; coordinated design planning for upgrading railing project on building for compliance; managed the design and ordering for new athletic scoreboard at Blair field; refresh of the Administration courtyard space with campus architect; design and construction planning for office suite renovation for the VP of Student Affair; coordinate design and requirements for airlift to place two new clamshells for Science building.
Johns Hopkins University
- Oversight of all FF&E, including the construction infrastructure requirements, furniture, desktop and server room equipment, audiovisual systems, and specialty equipment from the robotics laboratory, such as vibration table and delicate robotics prototypes; design and logistical coordination with JHU departments and construction project team regarding requirements, schedule, deliveries and install of FF&E and specialty equipment
- Developed temporary space during the $60M renovations at The Peabody Institute; managed all FF&E and moves of offices, classrooms, practice rooms, a music library, and archive items. Facilitated specialized clean-up after construction damage to the historic Peabody Library
MiraCosta Community College while employed by Element Consulting, Inc.
- Program project engineer on a $450M bond program for MiraCosta Community College
- Developed scope packages, schedules and budgets for consultants, general contractors and others to handle various aspects of the campus program and design
- Lead project manager for developing the criteria programming for Design/Build projects which include a new Allied Health, Chem/Bio, Student Services and Gymnasium buildings
- Design project manager for the renovation of the Administration building and the required temporary swing space facilities; developed FF&E budgets and strategies for both projects to stay within the program budgets
Palomar Community College
Transition Planning Manager for Athletics Softball Field, Football Field and support building projects.
- Softball field equipment, additional stadium requirements such as padding on top of fence, outfield poles, screenings at all fencing, rubber floor in dugouts; design of temporary cubbies for football players until new locker room completed; work coaches and athletics director on branding on equipment, screens throughout the complex and other signage.
Our extensive experience ensures that we can handle any project, regardless of size or complexity. We pride ourselves on delivering projects on time and within budget while maintaining the highest standards of quality and professionalism.